Fastening of crash barriers

Crash barrier anchor

TOGE TSM B

Adhesive screw anchor
for fastening crash barriers



Go to approval


Die TOGE TSM B Leitplankenschraube: In Kombination mit Injektionsmörtel erlaubt sie hohe Lastaufnahme im gerissenen und ungerissenen Beton. Der Verbundmörtel dichtet bei der Verarbeitung das Bohrloch ab und verhindert so das Eindringen von Wasser. Die TOGE TSM B ist zugelassen für Betonfestigkeitsklassen von C20/25 bis C50/60.

  • Easy and safe installation
  • High Loads
  • Frostproof
  • Special thread
  • Immediately loadable
Easy and safe installation

The optimized thread enables a quick and safe installation process.

High Loads

High load bearing capacity in cracked and non-cracked concrete.

Frostproof

Borehole sealing by the composite mortar prevents water penetration and frost damage in winter.

Special thread

Load transmission via undercut.

Immediately loadable

Immediately loadable without observing the curing time for the composite mortar.


DOWNLOADS

Headshapes and Materials


01 | TSM B 14 M16x35 SW12

Crashbarrier anchor size 14 – steel, anti-corrosion coated TOGE KORR

01 | TSM B 14 M16x35 SW12

Crashbarrier anchor size 14 – steel, anti-corrosion coated TOGE KORR


02 | TSM B 16 – M18x45 SW 13

Crashbarrier anchor size 16 – steel, anti-corrosion coated TOGE KORR

02 | TSM B 16 – M18x45 SW 13

Crashbarrier anchor size 16 – steel, anti-corrosion coated TOGE KORR


03 | CF-T 300V

Injection mortar and accessories

03 | CF-T 300V

Injection mortar and accessories



Which product is right for you?

Do you need support?
We will be happy to help!

Call us: +49 911 659 68-10


Approvals | Installation instructions | Technical information


Approval


Base Materials

Application in cracked and non-cracked concrete
of strength classes from C20/25 to C50/60.


This is how simple the installation works:

  1. Drill a hole perpendicular to the concrete surface.
  2. Thoroughly blow out the borehole.
  3. Brush the borehole 4x.
  4. Thoroughly clean the borehole again.
  5. Discard three full strokes of composite mortar – then inject composite mortar.
  6. Screw in screws with an impact screwdriver.
  7. After reaching the screw-in depth, the composite mortar must emerge at the concrete surface.
  8. Fix the attachment part. The attachment can be mounted immediately – there is no need to observe the curing time of the composite mortar.

Application Examples




Fastening of crash barrier systems


Downloads




Product
Information



Technical
Data



Safety Data Sheet
Composite Mortar CF-T 300 V



General design type approval +
General technical approval
approval Z-21.1.1799



Report TÜV Rheinland
Corrosion coating
TOGE-KORR


Get in touch

We look forward to
your call or e-mail.

+ 49 911 659 68-0

Contact form

Location

You can find us here

TOGE Dübel GmbH & Co. KG
Illesheimer Str. 10
90431 Nürnberg
GERMANY



News

Follow us and
keep updated.