Adhesive Screw Anchor

Concrete Screw

TOGE TSM Adhesive Screw Anchor

Combination with injection mortar
– for highest loads

Our TOGE TSM High Performance concrete screw in combination with injection mortar is the ideal solution when highest loads are required. Approved for concrete strength classes from C20/25 to C50/60 – in both cracked and non-cracked concrete – it is suitable for a wide range of applications: whether for fastening brackets, metal profiles, wooden structures, railings or handrails, through to heavy-duty use for fastening high racks or facade substructures.


TOGE TSM Adhesive Screw Anchor – At a Glance


Highest loads

Highest loads in concrete due to the combination of concrete screw with suitable injection mortar.

Instantly loadable

Immediately loadable directly after installation.

Frost proof

Sealing the borehole prevents water penetration and frost damage in winter.

Heavy Duty

Highest loads after curing of the injection mortar.

Headshapes and Materials


01 | TSM SW

Hexagonal head – steel, zinc plated

01 | TSM SW

Hexagonal head – steel, zinc plated


02 | TSM SW ZFC

Hexagonal head – steel, zinc flake coated

02 | TSM SW ZFC

Hexagonal head – steel, zinc flake coated


03 | TSM M12 SW

Metric connection thread M12 – Steel, zinc plated

03 | TSM M12 SW

Metric connection thread M12 – Steel, zinc plated


04 | TSM M12 A4

Metric connection thread M12 – stainless steel A4

04 | TSM M12 A4

Metric connection thread M12 – stainless steel A4


05 | CF-T 300V

Injection mortar and accessories

05 | CF-T 300V

Injection mortar and accessories



Which product is right for you?

Do you need support?
We will be happy to help!

Call us: +49 911 659 68-43


Application Examples




Fastening heavy duty shelving




Fastening railings


Approval | Installation Instructions | Technical Information


Approval


Base Materials

Application in cracked and non-cracked concrete
of strength classes from C20/25 to C50/60.


This is how simple the installation works:

  1. Create borehole.
  2. Clean the borehole thoroughly.
  3. Brush the borehole 4x.
  4. Thoroughly clean the borehole again.
  5. Discard three full strokes of composite mortar – then inject composite mortar.
  6. Screw in concrete screw.
  7. After reaching the embedment depth, the composite mortar must emerge at the concrete surface.
  8. The attachment can be installed immediately – there is no need to observe the curing time of the composite mortar.

Downloads




Product
Information



Technical
Data



General technical approval
Z-21.1-2074



Safety Data Sheet
Composite Mortar CF-T 300 V


Get in touch

We look forward to
your call or e-mail.

+ 49 911 659 68-0

Contact form

Location

You can find us here

TOGE Dübel GmbH & Co. KG
Illesheimer Str. 10
90431 Nürnberg
GERMANY



News

Follow us and
keep updated.